Top
Local Information
Home  /  Local Information  /  
Terminals & Facilities
Terminals & Facilities

 

Name

Tel No.

Remarks

On-Dock Terminal
PSA Corporation Limited
460 Alexandra Road, PSA Building
Singapore 119963

--

http://www.psa.com.sg

Operating 24 hours a day

Allied Container Yard
(Off Dock Depot)
Allied Container (Manufacturer and Engineers) Pte Ltd (Yard 5) Lot A, 17717 Tuas South Ave 1

68679240

--

PSA Corporation Limited
(Off Dock Depot)
Empire Complex 
39 Keppel Road

Singapore 089065

63211766
63212424
63212784

--

Freight Forwarding Arm
OOCL Logistics (Singapore) Pte Ltd
79 Anson Road, #14-00,
Singapore 079906

64381808

Operating hours:
- Mon - Fri 09:00 - 17:30hrs
- Saturday, Sunday and Public Holiday Closed

 

Name

Tel No.

Remarks

On-Dock Terminal
PSA Corporation Limited
460 Alexandra Road, PSA Building
Singapore 119963

--

http://www.psa.com.sg

Operating 24 hours a day

Allied Container Yard
(Off Dock Depot)
Allied Container (Manufacturer and Engineers) Pte Ltd (Yard 5) Lot A, 17717 Tuas South Ave 1

68679240

--

PSA Corporation Limited
(Off Dock Depot)
Empire Complex 
39 Keppel Road

Singapore 089065

 

 

63211766
63212424
63212784

--

Freight Forwarding Arm
OOCL Logistics (Singapore) Pte Ltd
79 Anson Road, #14-00,
Singapore 079906

64381808

Operating hours:
- Mon - Fri 09:00 - 17:30hrs
- Saturday, Sunday and Public Holiday Closed


2. Free Storage

  • Import Containers

    Commences from the time the container is discharged from the vessel
    If the free storage period is exceeded, the store rent shall be calculated from the time of completion of discharge of the vessel to the time of delivery.
    • Laden Container: 72 hours
    • Empty Container: 48 hours
    • Overheight / Overwidth: 48 hours
    • Refrigerated Container: 72 hours
  • Export Containers

    Commences from the time the container is received
    If the free storage period is exceeded, the store rent shall be calculated from the time of receipt of the container to the time the vessel berths.
    • Laden Container: 72 hours
    • Empty Container: 48 hours
    • Overheight / Overwidth: 48 hours
    • Refrigerated Container: 72 hours
  • Transhipment/Re-export Containers

    Both Loaded and Empty Transhipment or re-export containers have 168 hours free storage from the time of completion of discharge of the first vessel to the time of berthing of the second vessel.

·        Laden / Empty Transhipment Container: 168 hours

·        Laden / Empty Re-export Container: 168 hours

  • DG Containers

    No Dangerous Goods are allowed stay in the port without prior approval from PSA. Free storage for DG with approval from PSA:
    • Import/Export DG Container: 24 hours
    • Transhipment DG Container: 72 hours
  • Call Dates/Schedule: PSA PORTNET system available for On-line enquiry to the Industry.
  • Vessel berthing priority secured with PSA for all Alliance Services.

For further inquiries please contact local office directly.

 

 

 

 

    Local Information